| Building permit |
Bias50/ per SQM. |
| Amendment in the drawings |
R.O10/ |
| The excess are a at the building surface from 50% - 70% |
R.O 5/ per SQM. for the investment residential plots (Flats) or for the commercial residential or commercial plots ., Regarding the private buildings, Villas of maximum(2) Villas at the residential plots fees will beR.O3PerSQM. |
| Renewal of Building permit |
R.O10/ for (2)years. |
| Issuing replacement building permit |
R.O 10/ |
| Excess copies of the drawings |
Bias500/ for page . |
| Amending the name in the building permit
|
R.O5/ |
| Registration of applications submitted from the technical authorities. |
R.O20/ |
| Reports of the Consultant Offices required by the municipality |
R.O3/ |
| Copping documents or drawings from the plot file. |
Fees will be as follow . Copying each paper as the following measurements:. A4=Bias 100/, A3Bias200/ A2Bias400 /,A2 magnified Bias 500/ A1Bias700/ ,A0 magnifiedBias800/A0. Bias900 / ,A0 MagnifiedR.O1/ |
| Permit for labor camp |
Excellent R.O200/ First class R.O150 / Second class R.O100/ Third class R.O 75/andthe4th class R.O 50/. |
| Increasing the basement floor on the ground floor |
R.O1/ per the excess SQM .
|
| Allowing using basement floor as residential at Villa building type only . |
R.O 1/ per SQM. |
| Increasing the commercial (sada****) of the ground floor |
R.O1/for each excess SQM |
| Separation of----** entrance from the ground floor السدة |
Bias500/for each SQM. Of-----area. |
| Allowing using sada floor as residential area |
R.O1.500 / for each SQM. |
| Increasing the service attachments area from 20% - 30% of the building area or 155 of the plot area. |
R.O 3/SQM of Sadda ***** area |
| Separation of the commercial sadda entrance from the ground floor |
Bias500/ per SQM. of the sadda area. |
| Permit building commencement |
R.O5/ |